Sant’Anna Hospital, Como

The new Sant’Anna hospital in Como is located on an area of ​​over 80,000 m² south of the city of Como and a few hundred meters from the headquarters of Drytech Italia.

The Como Polyclinic has two underground floors exposed to a 2-meter flap, which will also house the operating theaters.

The waterproofing was carried out with the Drytech Tank System which, among other things, due to its construction characteristics and organization, ensured a significant reduction in days in the overall construction site budget.

The activities of the Drytech Tank System, in fact, are parallel to the others of the construction site so that, in fact, the waterproofing item has been removed from the work calendar.

To support the weight of the structure, the site of the construction site was consolidated with approximately 4000 reinforced concrete poles, with a depth varying between 20 and 30 meters.

The poles were thrown into shirts driven into the ground with micro-explosions.

Contractor: Infrastrutture Lombarde

Project: Euro-Project

Structure: Eng. Franco Mola, Milan

Construction: Consorzio S.AN.CO