The choice of the Drytech Tank as the waterproofing system for the Sant’Anna Hospital in Como ensured a significant reduction of work days in the overall site budget, thanks to the construction characteristics and organisation of the Drytech system.
The activities of the Drytech Tank are in fact parallel to the other activities of the site, so that the waterproofing item has been removed from the work schedule.
The Como Polyclinic has two underground floors exposed to a 2-meter flap, which will also house the operating theaters.
To support the weight of the structure, the site of the construction site was consolidated with approximately 4000 reinforced concrete poles, with a depth varying between 20 and 30 meters.
The poles were thrown into shirts driven into the ground with micro-explosions.
Contractor: Infrastrutture Lombarde
Project: Euro-Project
Structure: Eng. Franco Mola, Milan
Construction: Consorzio S.AN.CO